mail_outline sales@mediastorehouse.com
Runway construction JLP01_08_008192RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A man standing on a roller during the laying of asphalt on a new runway under construction at Gaydon Airfield
Runway construction JLP01_08_008198RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A man working during the construction of Gaydon Airfield, using a lever tool to remove a rivet fastening from shuttering formwork running along
Concrete foundations JLP01_08_008177RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. Men carrying out construction work at Gaydon Airfield, pouring and levelling concrete during the concreting of a buildings footprint
Runway construction JLP01_08_007948RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. Work underway on the construction of a new runway at Gaydon Airfield
Compacting the runway JLP01_08_022162aRAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A workman operating a Holman compactor during concreting of a runway or aircraft apron at Gaydon Airfield
Carpentry JLP01_08_008287RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A workman using an electric circular saw to cut wood for use in the construction of buildings at Gaydon Airfield
Paternoster Square JLP01_08_066513PATERNOSTER SQUARE, CITY OF LONDON. A view looking west showing various multi-storey blocks under construction as part of the Paternoster development
Workmen JLP01_08_064422PATERNOSTER SQUARE, CITY OF LONDON. Four workmen employed on the construction of the Paternoster development. Photographs of these four workers were published in the February 1963 issue of Laings
Night scene JLP01_08_064434PATERNOSTER SQUARE, CITY OF LONDON. A night-time view looking south-east across the Paternoster development, showing the site during construction with St Pauls Cathedral in the background
Paternoster Square JLP01_08_063433PATERNOSTER SQUARE, CITY OF LONDON. Looking west over the Paternoster development during its construction, showing the Old Bailey in the background and Christchurch Greyfriars on the right
Scaffolding JLP01_08_064381PATERNOSTER SQUARE, CITY OF LONDON. Looking up at a tower crane against a maze of scaffolding during the construction of the Paternoster development
Paternoster Square JLP01_08_062711PATERNOSTER SQUARE, CITY OF LONDON. Looking west during the construction of the Paternoster development, showing the Old Bailey in the background and Christchurch Greyfriars on the right
Piling core surveying JLP01_08_061976PATERNOSTER SQUARE, CITY OF LONDON. A team from Ground Engineering Ltd carrying out a site survey with a soft drilling rig during construction of the Paternoster development
Paternoster Square JLP01_08_060912aPATERNOSTER SQUARE, CITY OF LONDON. A McKinney Foundations crane and pile driver at work during the construction of the Paternoster development, with St Pauls Cathedral in the background
Sectra window panel JLP01_08_073399dRestell Close, Greenwich, Greater London. Workers installing a window panel during the construction of a Sectra block of nurses flats on Restell Close
Formwork construction JLP01_08_073399eRestell Close, Greenwich, Greater London. A Sectra block of nurses flats under construction on Restell Close, with the steel formwork in place for the next storey to be built
Speeches JLP01_11_44926_09NATIONAL INDOOR ARENA, KING EDWARDS ROAD, BIRMINGHAM. Martin Laing and two other men giving speeches during the topping out ceremony for the National Indoor Arena in Birmingham
Topping out JLP01_11_44925_12NATIONAL INDOOR ARENA, KING EDWARDS ROAD, BIRMINGHAM. Members of the site team raising their hard hats in celebration during the topping out ceremony for the National Indoor Arena in Birmingham
Playground JLP01_10_46030NATIONAL INDOOR ARENA, KING EDWARDS ROAD, BIRMINGHAM. A view of the National Indoor Arena in Birmingham during construction, taken from the west, with two children at a playground in the foreground
Nearing completion JLP01_10_50148NATIONAL INDOOR ARENA, KING EDWARDS ROAD, BIRMINGHAM. An interior view of the National Indoor Arena in Birmingham close to its completion, with the track down in the event space
Poultry JLP01_11_62368_32No. 1 Poultry, POULTRY, CITY OF LONDON. The internal timber colonnade of the central circular roof garden during construction at No. 1 Poultry, London
Coping JLP01_11_62368_35No. 1 Poultry, POULTRY, CITY OF LONDON. Workers fitting granite coping slabs to the wall supporting the timber colonnade of the central circular roof garden at No. 1 Poultry, London
Checking level JLP01_11_62368_05No. 1 Poultry, POULTRY, CITY OF LONDON. Two workers using a spirit level and wedges to precisely position a limestone block during construction of the circular clock tower at No. 1 Poultry
Drilling granite JLP01_11_62368_17No. 1 Poultry, POULTRY, CITY OF LONDON. A worker drilling into a granite slab during construction of the roof terrace at No. 1 Poultry, London
Through the legs of the dome JLP01_11_63405_10MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. An articulated lorry driving through the legs of one of the quadrapod bases to the pylons that support the roof structure at The Millennium
Inside the dome JLP01_11_63405_07MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. The view from just inside the entrance to The Millennium Dome, along the main thoroughfare towards the centre
Work in progress JLP01_11_63405_02MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. An elevated view of construction work on the central performance arena within The Millennium Dome
Construction vehicle access JLP01_11_63405_06MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. The main entrance to The Millennium Dome, used by all construction vehicles
Inside the dome JLP01_11_63404_05MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. A view across the entire span of The Millennium Dome from the elevated catwalk that encircles the whole structure
Piling in progress JLP01_11_63138_01MILLENNIUM DOME, DRAWDOCK ROAD, GREENWICH, GREATER LONDON. An interior view of The Millennium Dome. Showing the early stages of construction of the central performance arena with sections of sheet
Concreting JLP01_08_082071Minories Car Park, 1 Shorter Street, City of London. Two workmen releasing concrete from a hopper suspended from a crane for the roof slab of Minories Car Park
First piece of parapet JLP01_08_081727Minories Car Park, 1 Shorter Street, City of London. The first section of parapet wall in place at the north east corner of Minories Car Park
Curtain wall JLP01_08_081436Minories Car Park, 1 Shorter Street, City of London. The Shorter Street elevation of Minories Car Park during its construction
Moulding the floor slab JLP01_08_080294Minories Car Park, 1 Shorter Street, City of London. Polypropylene moulds in place to create the coffered structure of the floor slab of the first floor at Minories Car Park
Removing earlier foundations JLP01_08_079117Minories Car Park, 1 Shorter Street, City of London. A man in a suit stands in the basement excavations of Minories Car Park as two workers behind him break up concrete with pneumatic drills
Injecting concrete JLP01_08_079538Minories Car Park, 1 Shorter Street, City of London. A worker standing at the top of a tubular steel column and filling it with concrete from a crane-lifted hopper at Minories Car Park
Milburngate JLP01_10_19698Millburngate, Durham, County Durham. A view from Milburngate Bridge looking south-west towards construction of Millburngate, with a tower crane in front of the first stage of the centre
Working on pile foundations JLP01_10_37204LONDON METROPOLE HOTEL, EDGWARE ROAD, CITY OF WESTMINSTER, GREATER LONDON. Workers removing old pile foundations at the bottom of the basement excavations for the extension to the Metropole Hotel
Working on pile foundations JLP01_10_37202LONDON METROPOLE HOTEL, EDGWARE ROAD, CITY OF WESTMINSTER, GREATER LONDON. Workers using pneumatic drills to remove old pile foundations at the bottom of the basement excavations for the extension to
Bracing struts JLP01_10_37197LONDON METROPOLE HOTEL, EDGWARE ROAD, CITY OF WESTMINSTER, GREATER LONDON. Temporary steel bracing struts are in place to support the externals walls whilst the basement levels are excavated at
Construction site JLP01_10_34876LONDON METROPOLE HOTEL, EDGWARE ROAD, CITY OF WESTMINSTER, GREATER LONDON. An elevated view, from the existing hotel, of cranes
Preserving a facade JLP01_10_34181LONDON METROPOLE HOTEL, EDGWARE ROAD, CITY OF WESTMINSTER, GREATER LONDON. The interior of the facade of the former Westminster Arms public house
Topping out ceremony JLP01_09_811082MAYDAY HOSPITAL, LONDON ROAD, WEST THORNTON, CROYDON, GREATER LONDON. A group of people posed with celebratory drinks on the roof of the services block at Mayday Hospital during the topping out
Topping out ceremony JLP01_09_811081MAYDAY HOSPITAL, LONDON ROAD, WEST THORNTON, CROYDON, GREATER LONDON. Denis Sweaney, Chairman of Croydon Area Health Authority
Topping out ceremony JLP01_09_811079MAYDAY HOSPITAL, LONDON ROAD, WEST THORNTON, CROYDON, GREATER LONDON. Denis Sweaney, chairman of Croydon Area Health Authority
Lancashire Hill JLP01_08_077958Lancashire Hill, Stockport. A general view across a Laing construction site at Lancashire Hill, showing the excavation of the site prior to the erection of a 12M Jespersen scheme
Man at work JLP01_08_066041MANCHESTER. Looking up at a worker ascending a concrete staircase during the construction of a multi-storey block of Sectra flats in Manchester
Hangar walls JLP01_08_086451HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. The west wall of the BEA aircraft servicing hangar at Heathrow Airport during its construction