Skip to main content

Framed Print > Industry > Engineering and Construction > Graythorp - oil rigs

Framed Print : Oil platform JLP01_09_761306

Oil platform JLP01_09_761306




We accept all major credit cards


Photo Prints
Jigsaw Puzzles
Poster Prints
Image Downloads
Canvas Prints
Home Decor
Fine Art Prints
Metal Prints


Framed Photos from Historic England

Oil platform JLP01_09_761306

Graythorp, Hartlepool. A view of the oil platform Thistle A at Graythorp on the day of the naming ceremony, with an Elstree Plant platform in the foreground.
In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. Oil platforms, Graythorp I and Graythorp II were built at this site between 1972-1975, followed by Thistle A, which at the time was the largest steel oil production platform in the world

Media ID 24058958

© Historic England Archive. John Laing Photographic Collection

1970s Industry Marine Engineering Works Oil Rig


12"x10" Modern Frame

10x8 Print in an MDF Wooden Frame with 180 gsm Satin Finish Paper. Glazed using shatter proof thin plexi glass. Frame thickness is 1 inch and depth 0.75 inch. Fluted cardboard backing held with clips. Supplied ready to hang with sawtooth hanger and rubber bumpers. Spot clean with a damp cloth. Packaged foam wrapped in a card.

Contemporary Framed and Mounted Prints - Professionally Made and Ready to Hang

Estimated Image Size (if not cropped) is 25.4cm x 25.4cm (10" x 10")

Estimated Product Size is 25.4cm x 30.5cm (10" x 12")

These are individually made so all sizes are approximate

Artwork printed orientated as per the preview above, with landscape (horizontal) or portrait (vertical) orientation to match the source image.


MADE IN THE USA
Safe Shipping with 30 Day Money Back Guarantee

FREE PERSONALISATION*
We are proud to offer a range of customisation features including Personalised Captions, Color Filters and Picture Zoom Tools

SECURE PAYMENTS
We happily accept a wide range of payment options so you can pay for the things you need in the way that is most convenient for you

* Options may vary by product and licensing agreement. Zoomed Pictures can be adjusted in the Cart.



public
Made in USA
thumb_up
Professional quality finish
diamond
Made with high-grade materials
inventory_2
Carefully packed to aid safe arrival



Related Images


Welding JLP01_08_092403
Welding JLP01_08_092403
Preparing the dry dock JLP01_08_092044
Preparing the dry dock JLP01_08_092044
Cranes JLP01_08_092768
Cranes JLP01_08_092768
Surveying and a flotation tank JLP01_08_092770
Surveying and a flotation tank JLP01_08_092770
Cranes building cranes JLP01_08_093073
Cranes building cranes JLP01_08_093073
Measuring tubes JLP01_08_093174
Measuring tubes JLP01_08_093174
Cutting tubes JLP01_08_093175
Cutting tubes JLP01_08_093175
Large load JLP01_08_093188A
Large load JLP01_08_093188A
Graythorp basin JLP01_08_093188D
Graythorp basin JLP01_08_093188D
Graythorp basin JLP01_08_093188E
Graythorp basin JLP01_08_093188E
Floating off JLP01_08_099152
Floating off JLP01_08_099152
Oil platform JLP01_10_02539
Oil platform JLP01_10_02539

+

Shipping

+

Choices

+

Guaranteed