Skip to main content

Marine Engineering Works Collection

Background imageMarine Engineering Works Collection: Oil Rig on the river Tees JLP01_08_099192

Oil Rig on the river Tees JLP01_08_099192
Graythorp, Hartlepool. An aerial view of tug boats towing the oil platform Graythorp I along the Tees Estuary away from Graythorp

Background imageMarine Engineering Works Collection: Cranes building cranes JLP01_08_093073

Cranes building cranes JLP01_08_093073
Graythorp, Hartlepool. Two cranes on the quayside at Graythorp, lifting the foundation tub of a 509 Revolver crane

Background imageMarine Engineering Works Collection: Erecting a crane JLP01_10_01067

Erecting a crane JLP01_10_01067
Graythorp, Hartlepool. The foundation tub for a second 509 Revolver crane being lifted on to a gantry at Graythorp

Background imageMarine Engineering Works Collection: Oil platform JLP01_09_761306

Oil platform JLP01_09_761306
Graythorp, Hartlepool. A view of the oil platform Thistle A at Graythorp on the day of the naming ceremony, with an Elstree Plant platform in the foreground

Background imageMarine Engineering Works Collection: Oil rig JLP01_09_752285AB

Oil rig JLP01_09_752285AB
Graythorp, Hartlepool. A bird s-eye view of the oil platform Graythorp II and a large crowd of people gathered for its naming ceremony at Graythorp

Background imageMarine Engineering Works Collection: Naming ceremony JLP01_09_752240

Naming ceremony JLP01_09_752240
Graythorp, Hartlepool. A young woman carrying out the naming ceremony for the oil platform Graythorp II

Background imageMarine Engineering Works Collection: Oil Rig on the river Tees JLP01_08_099191

Oil Rig on the river Tees JLP01_08_099191
Graythorp, Hartlepool. An aerial view of tug boats towing the oil platform Graythorp I along the Tees Estuary away from Graythorp

Background imageMarine Engineering Works Collection: Oil rig leaving dry dock JLP01_08_099183

Oil rig leaving dry dock JLP01_08_099183
Graythorp, Hartlepool. A view of tug boats towing the oil platform Graythorp I away from the dry dock basin at Graythorp

Background imageMarine Engineering Works Collection: Floating off JLP01_08_099168

Floating off JLP01_08_099168
Graythorp, Hartlepool. An aerial view of Graythorp I floating in the flooded basin of the dry dock at Graythorp, with the dock gates removed prior to the launch of the oil platform

Background imageMarine Engineering Works Collection: Cranes JLP01_08_096485

Cranes JLP01_08_096485
Graythorp, Hartlepool. A view of the construction of an oil platform at Graythorp, showing cranes around the emerging structure

Background imageMarine Engineering Works Collection: Cranes JLP01_08_093454

Cranes JLP01_08_093454
Graythorp, Hartlepool. A view of cranes in operation at Graythorp

Background imageMarine Engineering Works Collection: Cranes building cranes JLP01_08_093214

Cranes building cranes JLP01_08_093214
Graythorp, Hartlepool. The foundation tub for a 509 Revolver crane being lifted on to a gantry at Graythorp

Background imageMarine Engineering Works Collection: Naming ceremony JLP01_09_761278

Naming ceremony JLP01_09_761278
Graythorp, Hartlepool. The naming ceremony of the oil platform Thistle A being carried out by J Potts, an apprentice draughtswoman at Graythorp

Background imageMarine Engineering Works Collection: Naming day JLP01_09_752265

Naming day JLP01_09_752265
Graythorp, Hartlepool. A crowd of people gathered at Graythorp for the naming ceremony of the oil platform Graythorp II

Background imageMarine Engineering Works Collection: Removing the gates JLP01_08_099166

Removing the gates JLP01_08_099166
Graythorp, Hartlepool. A view of the gates of the dry dock at Graythorp being removed by three tugs, prior to the launch of Graythorp I

Background imageMarine Engineering Works Collection: Floating off JLP01_08_099155

Floating off JLP01_08_099155
Graythorp, Hartlepool. An aerial view of the oil platform Graythorp I floating in the flooded basin of the dry dock at Graythorp

Background imageMarine Engineering Works Collection: Floating off JLP01_08_099152

Floating off JLP01_08_099152
Graythorp, Hartlepool. A view of the oil platform Graythorp I floating in the flooded basin of the dry dock at Graythorp

Background imageMarine Engineering Works Collection: Oil rig in dry dock JLP01_08_099151

Oil rig in dry dock JLP01_08_099151
Graythorp, Hartlepool. A view of the oil platform Graythorp I lying in the dry dock at Graythorp during the flooding of the basin

Background imageMarine Engineering Works Collection: Opening the flood gates JLP01_08_099148

Opening the flood gates JLP01_08_099148
Graythorp, Hartlepool. A view of the dry dock at Graythorp during the flooding of the basin, with a team of people watching from the dock gates above

Background imageMarine Engineering Works Collection: Oil rig in dry dock JLP01_08_098940

Oil rig in dry dock JLP01_08_098940
Graythorp, Hartlepool. A bird s-eye view of the oil platform Graythorp I lying on its side in the dry dock basin at Graythorp

Background imageMarine Engineering Works Collection: Cranes JLP01_08_096482

Cranes JLP01_08_096482
Graythorp, Hartlepool. A view of the construction of an oil platform at Graythorp, showing cranes around the emerging structure

Background imageMarine Engineering Works Collection: Cranes JLP01_08_093455A

Cranes JLP01_08_093455A
Graythorp, Hartlepool. A view of cranes in operation at Graythorp

Background imageMarine Engineering Works Collection: Fabrication workshop JLP01_08_093448

Fabrication workshop JLP01_08_093448
Graythorp, Hartlepool. An interior view of a fabrication workshop at Graythorp, showing part of an oil platform being assembled

Background imageMarine Engineering Works Collection: Cranes JLP01_08_093437

Cranes JLP01_08_093437
Graythorp, Hartlepool. A view of a crane lift taking place at Graythorp

Background imageMarine Engineering Works Collection: Graythorp basin JLP01_08_093188E

Graythorp basin JLP01_08_093188E
Graythorp, Hartlepool. A view over the basin at Graythorp, showing in situ fabrication being carried out on the flotation tanks for an oil platform

Background imageMarine Engineering Works Collection: Graythorp basin JLP01_08_093188D

Graythorp basin JLP01_08_093188D
Graythorp, Hartlepool. A view over the basin at Graythorp, showing in situ fabrication being carried out on the flotation tanks for an oil platform

Background imageMarine Engineering Works Collection: Cutting tubes JLP01_08_093175

Cutting tubes JLP01_08_093175
Graythorp, Hartlepool. Two Laing workers at Graythorp watching a precision tool cutting through a large metal tube

Background imageMarine Engineering Works Collection: Measuring tubes JLP01_08_093174

Measuring tubes JLP01_08_093174
Graythorp, Hartlepool. A team of Laing workers measuring a large metal tube in one of the welding huts at Graythorp

Background imageMarine Engineering Works Collection: Surveying and a flotation tank JLP01_08_092770

Surveying and a flotation tank JLP01_08_092770
Graythorp, Hartlepool. A flotation tank for an oil platform lying in the dry dock at Graythorp and a man carrying out surveying in the foreground

Background imageMarine Engineering Works Collection: Cranes JLP01_08_092768

Cranes JLP01_08_092768
Graythorp, Hartlepool. A general view of progress at Graythorp, showing a 509 Revolver crane in the process of being constructed

Background imageMarine Engineering Works Collection: Preparing the dry dock JLP01_08_092044

Preparing the dry dock JLP01_08_092044
Graythorp, Hartlepool. A view of progress on preparing Graythorp for the construction of North Sea oil platforms, showing cranes at work in the dry dock

Background imageMarine Engineering Works Collection: Welding JLP01_08_092403

Welding JLP01_08_092403
Graythorp, Hartlepool. Two people working in the welding school at Graythorp


All products are expertly crafted, using premium materials, tailored to your specifications and promptly shipped