mail_outline sales@mediastorehouse.com
Opening of Coryton Refinery JLP01_08_021310CORYTON OIL REFINERY, THURROCK, ESSEX. A view of HM Queen Elizabeth the Queen Mother and dignitaries at an exhibition stand at Coryton Oil Refinery
Opening of Coryton Refinery JLP01_08_021308CORYTON OIL REFINERY, THURROCK, ESSEX. Mrs J. W. Laing being presented to Her Majesty Queen Elizabeth, the Queen Mother, at the ceremonial opening of Coryton Oil Refinery Coryton Oil Refinery was
Coryton Refinery control room JLP01_08_020884aCORYTON OIL REFINERY, THURROCK, ESSEX. A worker operating the control board in the control room of the Air-Lift Thermofor Catalytic Cracking Unit at Coryton Oil Refinery
Piling foundations JLP01_01_167_38CORYTON OIL REFINERY, THURROCK, ESSEX. Foundation work in progress for the Crude Distillation Unit at Coryton Oil Refinery
Coryton Refinery cafeteria JLP01_067_26CORYTON OIL REFINERY, THURROCK, ESSEX. Staff using the food counter at the newly built self-service cafeteria at Coryton Oil Refinery
Skidding oil tanks JLP01_08_022844STANLOW OIL REFINERY, STANLOW, ELLESMERE PORT, CHESHIRE. An oil tank being skidded along tracks by two Caterpillar D8 tractors fitted with winches at Stanlow Oil Refinery
Oil refinery JLP01_10_08883Lindsey Oil Refinery, North Killingholme, North Lincolnshire. An exterior view of the newly completed Alkylation Unit at Lindsey Oil Refinery
Coryton Refinery flood defences JLP01_08_020888CORYTON OIL REFINERY, THURROCK, ESSEX. Workers constructing a protective wall of precast concrete blocks at Coryton Oil Refinery, as part of extensive flood prevention work at the site
Coryton flood response 1953 JLP01_08_008073CORYTON OIL REFINERY, THURROCK, ESSEX. Flooding on the construction site of Coryton Oil Refinery, showing flood water in the tank farm area and workmen transporting sandbags in the foreground
Coryton Refinery JLP01_01_167_54CORYTON OIL REFINERY, THURROCK, ESSEX. Workers moving a floating petrol tank during the construction of Coryton Oil Refinery, showing the tank just prior to turning the corner
Piling rig JLP01_01_167_47CORYTON OIL REFINERY, THURROCK, ESSEX. Workmen operating a Neilens pile frame during construction at Coryton Oil Refinery, showing the 4 ton hammer driving a 16" x 16" pile foundation
Tamping JLP01_167_07CORYTON OIL REFINERY, THURROCK, ESSEX. A group of workmen operating a 46ft long tamper during the construction of a 92ft diameter tank base at Coryton Oil Refinery
Coryton Refinery from the air JLP01_068_26CORYTON OIL REFINERY, THURROCK, ESSEX. An aerial view from the north showing Coryton Oil Refinery during its construction
Coryton Refinery from the air JLP01_068_22CORYTON OIL REFINERY, THURROCK, ESSEX. An aerial view from the north-west showing Coryton Oil Refinery during its construction
Coryton Refinery from the air JLP01_068_14CORYTON OIL REFINERY, THURROCK, ESSEX. An aerial view from the west showing Coryton Oil Refinery during its construction
Cutting reinforcing rods JLP01_065_33CORYTON OIL REFINERY, THURROCK, ESSEX. Two workmen using a hand operated machine to cut a 3/8" reinforcing rod during the construction of Coryton Oil Refinery
Coryton Refinery JLP01_09_802343CORYTON OIL REFINERY, THURROCK, ESSEX. A portrait of a group of workmen employed on the IE&C extension contract at Coryton Oil Refinery