Skip to main content
sales@mediastorehouse.com
Tel: (678) 701-8254

Renovation Gallery

Available as Prints and Gift Items

Choose from 28 pictures in our Renovation collection for your Wall Art or Photo Gift. All professionally made for Quick Shipping.


Repairing Victoria Tower OWS01_02_h01076b
Repairing Victoria Tower OWS01_02_h01076b
Full Range of Prints and Gifts in Stock
Crane DP092097
Crane DP092097
Full Range of Prints and Gifts in Stock
Scaffolding DP092099
Scaffolding DP092099
Full Range of Prints and Gifts in Stock
Flashing JLP01_09_910282
Flashing JLP01_09_910282
Full Range of Prints and Gifts in Stock
Welding JLP01_11_32608_10
Welding JLP01_11_32608_10
Full Range of Prints and Gifts in Stock
Three Bulls Head pub JLP01_14_00061
Three Bulls Head pub JLP01_14_00061
Full Range of Prints and Gifts in Stock
Restoration JLP01_10_16340
Restoration JLP01_10_16340
Full Range of Prints and Gifts in Stock
Preserving a facade JLP01_10_34181
Preserving a facade JLP01_10_34181
Full Range of Prints and Gifts in Stock
Colour-matching JLP01_10_16151
Colour-matching JLP01_10_16151
Full Range of Prints and Gifts in Stock
Colour-matching JLP01_10_16152
Colour-matching JLP01_10_16152
Full Range of Prints and Gifts in Stock
Battersea Power Station 33460_032
Battersea Power Station 33460_032
Full Range of Prints and Gifts in Stock
Buttercross renovation JLP01_10_18911
Buttercross renovation JLP01_10_18911
Full Range of Prints and Gifts in Stock
Welding JLP01_11_32608_10 Featured Image

Welding JLP01_11_32608_10

SEVERN BRIDGE, M48, AUST, SOUTH GLOUCESTERSHIRE. A welder within one of the deck sections of the Severn Bridge strengthening the joints between the steel ribs.
The original design and construction of the Severn Bridge had under estimated the increased volume of traffic since its completion in 1966 and whilst built to last 120 years it was found to require remedial work after just 20. Laing Industrial Engineering & Construction won the £29.5m contract from the Department of Transport and strengthening work on all elements of the structure began in May 1987. The project was completed in April 1990 in the same year that Laing jointly won the contract for the construction of the second Severn Crossing that would take the traffic pressure off the first bridge and extend its lifespan even further

© Historic England Archive

Buttercross renovation JLP01_10_18910
Buttercross renovation JLP01_10_18910
Full Range of Prints and Gifts in Stock
Buttercross renovation JLP01_10_18909
Buttercross renovation JLP01_10_18909
Full Range of Prints and Gifts in Stock
Stonemason JLP01_09_860342
Stonemason JLP01_09_860342
Full Range of Prints and Gifts in Stock
Scaffolding DP248470
Scaffolding DP248470
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075747
Carlisle Cathedral JLP01_08_075747
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075746
Carlisle Cathedral JLP01_08_075746
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075745
Carlisle Cathedral JLP01_08_075745
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075742
Carlisle Cathedral JLP01_08_075742
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_10_13955
Carlisle Cathedral JLP01_10_13955
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_10_13952
Carlisle Cathedral JLP01_10_13952
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_10_07911
Carlisle Cathedral JLP01_10_07911
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075748
Carlisle Cathedral JLP01_08_075748
Full Range of Prints and Gifts in Stock
Carlisle Cathedral JLP01_08_075746 Featured Image

Carlisle Cathedral JLP01_08_075746

CARLISLE CATHEDRAL, CARLISLE, CUMBRIA. Foreman stonemason, Ted Drinkwater, working at Carlisle Cathedral checking a stone head on the north face of the cathedral. Half its face had been replaced using SBD Certite as the adhesive.
This photograph is part of a batch taken by Laing to show restoration work being carried out using SBD Certite. In 1961, N M Phillips, the architect for Carlisle Cathedral started experimenting with the bonding material SBD Certite in the restoration of the cathedral. It was used on all but one of the decorated Gothic windows of the South Clerestory and by the time this photograph was taken, it was being used in the restoration of the north face of the cathedral. By using SBD Certite, Laing stonemasons were able to remove just the weathered surface of the stonework. New stone only two inches deep could be bonded to the old stone saving more of the original fabric of the building and cutting costs by a third. The photograph was published in April 1967 in Laing's monthly newsletter Team Spirit

© Historic England Archive. John Laing Photographic Collection

Shrewsbury Flaxmill Maltings DP235186
Shrewsbury Flaxmill Maltings DP235186
Full Range of Prints and Gifts in Stock
Shrewsbury Flaxmill Maltings DP235184
Shrewsbury Flaxmill Maltings DP235184
Full Range of Prints and Gifts in Stock
Scaffolding DP232580
Scaffolding DP232580
Full Range of Prints and Gifts in Stock
Bablake School, 1941 AA42_00294
Bablake School, 1941 AA42_00294
Full Range of Prints and Gifts in Stock