Skip to main content

Home > Images Dated > 2021 > December > 1 Dec 2021

Images Dated 1st December 2021

Choose a picture from our collection for your Wall Art and Photo Gifts

40 Items

Background imageImages Dated 1st December 2021: Steel liner for the dome JLP01_10_49262

Steel liner for the dome JLP01_10_49262
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Looking south-east towards the reactor building on the construction site of Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Surveying JLP01_10_54656

Surveying JLP01_10_54656
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A student engineer and a chain girl surveying

Background imageImages Dated 1st December 2021: Steel liner for the dome JLP01_10_49267

Steel liner for the dome JLP01_10_49267
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Looking south-east towards the reactor building on the construction site of Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Sizewell A and foundations of Sizewell B JLP01_11_35184_02

Sizewell A and foundations of Sizewell B JLP01_11_35184_02
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. A view of the reactor building under construction at Sizewell B Nuclear Power Station, with Sizewell A visible in the background

Background imageImages Dated 1st December 2021: Reactor building JLP01_11_53921_06

Reactor building JLP01_11_53921_06
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Laing workers concreting the top of the reactor dome during the construction of Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Reactor dome JLP01_11_54331_12

Reactor dome JLP01_11_54331_12
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Looking south-east towards the reactor dome during the construction of Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Reactor building JLP01_11_42553_06

Reactor building JLP01_11_42553_06
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Men working on the construction of the reactors auxiliary building at Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Reactor containment building JLP01_11_42552_05

Reactor containment building JLP01_11_42552_05
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. A view from a tower crane showing the reactor containment building during construction at Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Second Severn Crossing JLP01_11_62047_11

Second Severn Crossing JLP01_11_62047_11
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing, looking along the deck of the bridge at dusk

Background imageImages Dated 1st December 2021: Prime Minister John Major JLP01_11_58862

Prime Minister John Major JLP01_11_58862
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. Prime Minister John Major seen on a visit to the Second Severn Crossing Visitors Centre

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60075_06

Joining deck units JLP01_11_60075_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east from the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60074_11

Joining deck units JLP01_11_60074_11
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking west from the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60073_06

Joining deck units JLP01_11_60073_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking west from the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60072_11

Joining deck units JLP01_11_60072_11
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east from the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60071_08

Joining deck units JLP01_11_60071_08
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking west from the top of a bridge pylon during the construction of the Second Severn

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60071_06

Joining deck units JLP01_11_60071_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view from the top of a bridge pylon during the construction of the Second Severn Crossing

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_60010_03

Deck launch gantry JLP01_60010_03
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. The deck units of the bridge on the Second Severn Crossing being installed by a specially designed

Background imageImages Dated 1st December 2021: Bridge deck JLP01_60009_12

Bridge deck JLP01_60009_12
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A Blaw-Knox asphalt paver laying asphalt on the deck of the bridge during the construction of

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_11_60006_03

Deck launch gantry JLP01_11_60006_03
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of bridge deck units being installed during the construction of the Second Severn Crossing

Background imageImages Dated 1st December 2021: Bridge deck JLP01_60007_04

Bridge deck JLP01_60007_04
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view along the deck of the bridge during the construction of the Second Severn Crossing

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60077_06

Joining deck units JLP01_11_60077_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east along the deck of the bridge during the construction of the Second Severn

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60077_01

Joining deck units JLP01_11_60077_01
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east from near the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Joining deck units JLP01_11_60075_07

Joining deck units JLP01_11_60075_07
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east from near the top of the Second Severn Crossing during its construction

Background imageImages Dated 1st December 2021: Second Severn Crossing JLP01_11_60571_01

Second Severn Crossing JLP01_11_60571_01
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. An aerial view of the Second Severn Crossing from the south-east

Background imageImages Dated 1st December 2021: Second Severn Crossing JLP01_60568_12

Second Severn Crossing JLP01_60568_12
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. An aerial view looking north-east along the River Severn

Background imageImages Dated 1st December 2021: Working on the reactor dome JLP01_11_54002_12

Working on the reactor dome JLP01_11_54002_12
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Two workers on the surface of the reactor dome at Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Reactor building JLP01_11_53920_10

Reactor building JLP01_11_53920_10
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. Laing workers concreting the top of the reactor dome during the construction of Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Steel lining JLP01_11_52397_06

Steel lining JLP01_11_52397_06
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. The reactor building under construction at Sizewell B Nuclear Power Station, seen from a tower crane to the north

Background imageImages Dated 1st December 2021: Steel lining JLP01_11_47191_02

Steel lining JLP01_11_47191_02
SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL. A view of the reactor containment building under construction at Sizewell B Nuclear Power Station

Background imageImages Dated 1st December 2021: Second Severn Crossing JLP01_11_62048_06

Second Severn Crossing JLP01_11_62048_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing, looking along the deck of the bridge at night

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_11_60005_08

Deck launch gantry JLP01_11_60005_08
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. The deck units of the bridge on the Second Severn Crossing being installed by a specially designed

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_11_58176_03

Deck launch gantry JLP01_11_58176_03
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing under construction

Background imageImages Dated 1st December 2021: Concrete caissons JLP01_11_56743_08

Concrete caissons JLP01_11_56743_08
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the construction of the Second Severn Crossing

Background imageImages Dated 1st December 2021: Concrete batching plant JLP01_11_56741_06

Concrete batching plant JLP01_11_56741_06
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the construction of the Second Severn Crossing

Background imageImages Dated 1st December 2021: Transport Minister on TV JLP01_11_56739

Transport Minister on TV JLP01_11_56739
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. Robert Key, Transport Minister

Background imageImages Dated 1st December 2021: Concrete caissons JLP01_11_56739_03

Concrete caissons JLP01_11_56739_03
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing construction site

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_10_57949

Deck launch gantry JLP01_10_57949
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing under construction

Background imageImages Dated 1st December 2021: Deck launch gantry JLP01_10_57844

Deck launch gantry JLP01_10_57844
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Second Severn Crossing under construction

Background imageImages Dated 1st December 2021: Piling rig JLP01_10_54657

Piling rig JLP01_10_54657
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Jay Robertson, a large jack-up barge

Background imageImages Dated 1st December 2021: Piling rig JLP01_10_54654

Piling rig JLP01_10_54654
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view of the Jay Robertson, a large jack-up barge


All products are expertly crafted, using premium materials, tailored to your specifications and promptly shipped