BARBICAN, CITY OF LONDON. A Laing surveyor using a theodolite instrument, stood infront of a railway line on the construction site of the Barbican development.
Work began on building London's Barbican development in 1962. The construction of this complex megastructure was designed to be carried out in six phases, with different contractors working on the site. In 1964 John Laing and Son Ltd won the tender for Phase III, and they finished Speed House in 1968. The Company were also responsible for the construction of the Barbican Arts Centre (Phase V), which began in the early 1970s and was completed in 1981
Copyright © Historic England Archive. John Laing Photographic Collection
Media ID 23819113
Date: 1st October 2021
Copyright Status: Copyrighted Work
Source: Historic England Archive
Owner URL: https://images.historicenglandservices.org.uk/
Credit: A© Historic England Archive. Joh
Image Size: 5303 x 5343 Pixels
Filesize is 3.49MB
Associated Categories: Building the Barbican
Keywords: construction, surveying, telescope