Joining deck units JLP01_11_60077_06

Other options available, please contact us for more details
Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A view looking east along the deck of the bridge during the construction of the Second Severn Crossing, showing cables supporting the deck of the bridge and work being carried out to join the deck units.
The Second Severn Crossing took four years to build and was a joint civil engineering project between Laing Civil Engineering and the French company GTM. The work started in April 1992 and the opening ceremony later took place on 5th June 1996. The crossing is a cable-stayed bridge which stretches over 5000 metres across the River Severn connecting England and Wales, 3 miles downstream from the Severn Bridge which opened in 1966
Copyright © Historic England Archive. John Laing Photographic Collection
Media ID 24113017
Date: 1st December 2021
Copyright Status: Copyrighted Work
Source: Historic England Archive
Owner URL: https://images.historicenglandservices.org.uk/
Credit: A© Historic England Archive. Joh
Image Size: 5205 x 5263 Pixels
Filesize is 5.67MB
Associated Categories: M4 Second Severn Crossing
Keywords: 1990s, bridge, construction, motorway