Checking floor level JLP01_08_053125a

Other options available, please contact us for more details
COUNTY HIGH SCHOOL, GEDLING ROAD, ARNOLD, GEDLING, NOTTINGHAMSHIRE. A worker using a spirit level to precisely lay a concrete footing slab for a Laingspan wall during the construction of Arnold County High School.
Work began on the site in March 1958 and construction was completed for the new school term in September 1959. Laingspan was a flexible modular system of frame construction using precast pre-stressed concrete units. Laing developed the system in conjunction with the Architects and Buildings Branch of the Ministry of Education and consulting engineer A J Harris. The Arnold school was the first building for which the system was used beyond a prototype extension to Laing's own Research and Development Centre. Designed to economise on steel consumption and minimise on wet trades to speed up construction, the system went on to be used for other building types including offices and hospitals
Copyright © Historic England Archive
Media ID 24329900
Date: 10th February 2022
Copyright Status: Copyrighted Work
Source: Historic England Archive
Owner URL: https://images.historicenglandservices.org.uk/
Credit: A© Historic England Archive. Joh
Image Size: 6815 x 5209 Pixels
Filesize is 7.69MB
Associated Categories: Building Schools
Keywords: 1950s, constuction, education, grammar, innovation, people, school, work