Building the Commonwealth Institute Gallery
Choose from 14 pictures in our Building the Commonwealth Institute collection for your Wall Art or Photo Gift. All professionally made for Quick Shipping.
Industry
> Engineering and Construction
>> Building airports and airfields
>> Building Car Parks
>> Building Hospitals
>> Building Housing schemes
>> Building Motorways
>> Building Offices
>> Building Power Stations
>> Building Schools
>> Building the Commonwealth Institute
>> Building the Bull Ring
>> Building the British Library
>> Moving the earth
>> Building London Central Mosque
>> Cranes
>> Graythorp - oil rigs
>> Pipelines
>> Coventry Cathedral
>> Coryton Oil Refinery
>> Clifton Cathedral
>> Sugar silos
>> Building the Barbican
>> Steel frame construction
Archaeology
Flight
Sports
England at War
Animal Magic
Waterloo 200
The way we were
Transport
Abstracts
Fame
More features
Seasons
Landscapes
Architecture
Historic Images
Travel England
Heritage
Fine Art
Images Dated

Roof support strut JLP01_08_060600
COMMONWEALTH INSTITUTE, KENSINGTON HIGH STREET, KENSINGTON AND CHELSEA, GREATER LONDON. The peg-shaped roof support strut at the north corner of the Commonwealth Institute exhibition hall, partially cast with the internal steel still visible at the top.
Laing built the Commonwealth Institute between October 1960 and October 1962 to replace the former Imperial Institute that was to be demolished to make way for new facilities at Imperial College. The building consisted of a four-storey administrative block housing a library, restaurant, board room and conference hall and a separate two-storey b lock containing a cinema with an art gallery above, but the focus of the project was the exhibition hall with its hyperbolic paraboloid roof, the first of its kind constructed in Great Britain. The exhibition, designed by James Gardner, provided spaces where each of the Commonwealth nations could showcase their achievements and characteristics, primarily to school children as teaching aids to enliven history and geography lessons.
The shell arch of the central roof section was of reinforced concrete, cast in situ using timber formwork with rough sawn boards to provide a textured internal surface whilst the four outer "warps" were constructed using precast beams and wood wool slabs, blocks of shredded timber bound together in a cement paste and left visible from the interior. The entire roof was then clad in copper sheeting over a layer of vermiculite. It covers an area of 33,700sqft, 183 feet square with the central section 93 feet square and ranges between 30ft high at its lowest and 80ft at the peaks. This photograph appeared in the October 1961 issue of Team Spirit, the Laing company newsletter