44 Items
Platform substructure JLP01_11_38577_06
Oil Rig on the river Tees JLP01_08_099192
Oil Rig on the river Tees JLP01_08_099191
Floating off JLP01_08_099152
Cranes building cranes JLP01_08_093073
Decommissioned oil rig DP249057
Oil platform JLP01_10_02539
Parts for an oil platform JLP01_10_01079A
Erecting a crane JLP01_10_01067
Oil platform JLP01_09_761306
Leaving the rig JLP01_09_752285AF
Oil rig JLP01_09_752285AB
Naming day JLP01_09_752265
Oil platform JLP01_09_752243
Naming ceremony JLP01_09_752240
Oil rig leaving dry dock JLP01_08_099183
Floating off JLP01_08_099168
Removing the gates JLP01_08_099166
Floating off JLP01_08_099155
Cranes JLP01_08_096485
Cranes JLP01_08_093455A
Cranes JLP01_08_093454
Crane operators JLP01_08_093216C
Cranes JLP01_08_093437
Cranes building cranes JLP01_08_093214
Cranes JLP01_08_092768
Welding JLP01_08_092403
Naming ceremony JLP01_09_761278
Oil rig in dry dock JLP01_08_099151
Opening the flood gates JLP01_08_099148
Oil rig in dry dock JLP01_08_098940
Cranes JLP01_08_096482
Fabrication workshop JLP01_08_093448
Crane lift director JLP01_08_093216A
Graythorp basin JLP01_08_093188E
Graythorp basin JLP01_08_093188D
Large load JLP01_08_093188A
Cutting tubes JLP01_08_093175
Measuring tubes JLP01_08_093174
Surveying and a flotation tank JLP01_08_092770
Preparing the dry dock JLP01_08_092044
Carruthers Crane JLP01_10_00964
Oil rig on the move JLP01_10_01584_6
Oil rig on the move JLP01_10_01378