Skip to main content

Construction Collection (page 12)

Background imageConstruction Collection: Junction 16 nearing completion JLP01_01_154_084

Junction 16 nearing completion JLP01_01_154_084
M1 Motorway, Junction 16, M1, Upper Heyford, South Northamptonshire. An aerial view looking northwards towards Junction 16 on the M1

Background imageConstruction Collection: Railway bridge JLP01_01_142_21

Railway bridge JLP01_01_142_21
M1 Motorway, Structure 112 Railway Bridge, M1, Barby, Daventry, Northamptonshire. A view showing the deck of Structure 112 in position

Background imageConstruction Collection: On site catering JLP01_01_062_032

On site catering JLP01_01_062_032
M1 Motorway, Challney, Luton. A group of Laing workers using a site catering van on Section B3 of the construction site of the M1, the London to Yorkshire Motorway

Background imageConstruction Collection: Bridges JLP01_01_140_140

Bridges JLP01_01_140_140
M1 Motorway, Structure 9 Luton-Dunstable Railway Bridge, M1, Caddington, Central Bedfordshire. An aerial view of the London to Yorkshire Motorway (the M1) under construction

Background imageConstruction Collection: Regents Park Mosque JLP01_10_04821A

Regents Park Mosque JLP01_10_04821A
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the newly completed London Central Mosque taken from a high vantage

Background imageConstruction Collection: Doors to the prayer hall JLP01_10_04612

Doors to the prayer hall JLP01_10_04612
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. Interior view of the entrance hall in the London Central Mosque

Background imageConstruction Collection: Regents Park Mosque JLP01_10_04523

Regents Park Mosque JLP01_10_04523
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the London Central Mosque from the western boundary of the site

Background imageConstruction Collection: Installing geometric tiles JLP01_10_04403

Installing geometric tiles JLP01_10_04403
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. View of men at work on the geometric tile decoration of the domed ceiling in

Background imageConstruction Collection: Installing the finial JLP01_10_04300

Installing the finial JLP01_10_04300
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. View of London Central Mosque from the north-east

Background imageConstruction Collection: Installing the finial JLP01_10_04298

Installing the finial JLP01_10_04298
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. View of London Central Mosque from the Outer Circle of Regents Park showing a

Background imageConstruction Collection: Crescent JLP01_10_04209

Crescent JLP01_10_04209
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A detail of the crescent finial adorning the minaret at the London Central Mosque

Background imageConstruction Collection: Gilding the dome JLP01_10_04103

Gilding the dome JLP01_10_04103
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. View of three workmen on scaffolding fixing the gold-coloured copper alloy

Background imageConstruction Collection: Scaffolding JLP01_10_04059

Scaffolding JLP01_10_04059
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view showing progress in the construction of the London Central Mosque

Background imageConstruction Collection: Laying bricks JLP01_10_03484

Laying bricks JLP01_10_03484
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the London Central Mosque under construction

Background imageConstruction Collection: Arcades JLP01_09_771709

Arcades JLP01_09_771709
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. View of the newly completed London Central Mosque taken from the west

Background imageConstruction Collection: Presentation JLP01_09_771565

Presentation JLP01_09_771565
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. Project manager Peter Devine is presented with a framed print inscribed with

Background imageConstruction Collection: Arcades JLP01_09_771229

Arcades JLP01_09_771229
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the London Central Mosque taken from west of the courtyard

Background imageConstruction Collection: Installing the finial JLP01_09_770401

Installing the finial JLP01_09_770401
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. Men wearing safety harnesses positioning the crescent finial on the domed roof of

Background imageConstruction Collection: Crescent finial JLP01_09_770400

Crescent finial JLP01_09_770400
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. Close-up view of a man with the crescent finial outside the London Central Mosque

Background imageConstruction Collection: Laying bricks JLP01_09_760967

Laying bricks JLP01_09_760967
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the construction site of the London Central Mosque

Background imageConstruction Collection: Minaret construction team JLP01_09_753519

Minaret construction team JLP01_09_753519
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. The site team at the London Central Mosque stood in front of the minaret

Background imageConstruction Collection: Slipform construction JLP01_09_753514

Slipform construction JLP01_09_753514
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view of the minaret at the London Central Mosque being slipformed in two

Background imageConstruction Collection: Construction site JLP01_09_740944

Construction site JLP01_09_740944
London Central Mosque and The Islamic Cultural Centre, Park Road, Regents Park, City of Westminster, Greater London. A view across the construction site of the London Central Mosque

Background imageConstruction Collection: Assembling Easiform housing jlp01_08_001312

Assembling Easiform housing jlp01_08_001312
HOLLINGTON, HASTINGS, EAST SUSSEX. A man placing the framework for a doorway in the shuttering of an Easiform house during the construction of a housing estate in Hastings

Background imageConstruction Collection: Assembling Easiform housing jlp01_08_001308

Assembling Easiform housing jlp01_08_001308
HOLLINGTON, HASTINGS, EAST SUSSEX. A man fixing the framework for a doorway into the shuttering of an Easiform house during the construction of a housing estate in Hastings

Background imageConstruction Collection: Surveyor jlp01_08_001275

Surveyor jlp01_08_001275
HOLLINGTON, HASTINGS, EAST SUSSEX. A man using a mounted theodolite to survey the construction site of an Easiform housing estate in Hastings

Background imageConstruction Collection: Erecting a crane JLP01_10_01067

Erecting a crane JLP01_10_01067
Graythorp, Hartlepool. The foundation tub for a second 509 Revolver crane being lifted on to a gantry at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication

Background imageConstruction Collection: Cranes JLP01_08_096485

Cranes JLP01_08_096485
Graythorp, Hartlepool. A view of the construction of an oil platform at Graythorp, showing cranes around the emerging structure

Background imageConstruction Collection: Cranes JLP01_08_096482

Cranes JLP01_08_096482
Graythorp, Hartlepool. A view of the construction of an oil platform at Graythorp, showing cranes around the emerging structure

Background imageConstruction Collection: Cranes JLP01_08_093455A

Cranes JLP01_08_093455A
Graythorp, Hartlepool. A view of cranes in operation at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard

Background imageConstruction Collection: Cranes JLP01_08_093454

Cranes JLP01_08_093454
Graythorp, Hartlepool. A view of cranes in operation at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard

Background imageConstruction Collection: Cranes JLP01_08_093437

Cranes JLP01_08_093437
Graythorp, Hartlepool. A view of a crane lift taking place at Graythorp. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard

Background imageConstruction Collection: Crane lift director JLP01_08_093216A

Crane lift director JLP01_08_093216A
Graythorp, Hartlepool. A worker at Graythorp, wearing a two-way radio set during lifting being carried out on site. In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication

Background imageConstruction Collection: Graythorp basin JLP01_08_093188E

Graythorp basin JLP01_08_093188E
Graythorp, Hartlepool. A view over the basin at Graythorp, showing in situ fabrication being carried out on the flotation tanks for an oil platform

Background imageConstruction Collection: Graythorp basin JLP01_08_093188D

Graythorp basin JLP01_08_093188D
Graythorp, Hartlepool. A view over the basin at Graythorp, showing in situ fabrication being carried out on the flotation tanks for an oil platform

Background imageConstruction Collection: Preparing the dry dock JLP01_08_092044

Preparing the dry dock JLP01_08_092044
Graythorp, Hartlepool. A view of progress on preparing Graythorp for the construction of North Sea oil platforms, showing cranes at work in the dry dock

Background imageConstruction Collection: Rescue team demonstration JLP01_09_751828

Rescue team demonstration JLP01_09_751828
Grain Power Station, Grain, Isle of Grain, Medway, Kent. The site rescue team using a dummy victim and scaffolding to demonstrate the rescue of a worker overcome by fumes at a great height

Background imageConstruction Collection: Health and safety exhibition JLP01_09_751824

Health and safety exhibition JLP01_09_751824
Grain Power Station, Grain, Isle of Grain, Medway, Kent. Three men at a Laing exhibition stand looking at a display of faulty lifting tackle and hard hats that had saved lives

Background imageConstruction Collection: Moving concrete slabs JLP01_08_096704

Moving concrete slabs JLP01_08_096704
Grain Power Station, Grain, Isle of Grain, Medway, Kent. Laing workers assisting with the movement of a rectangular concrete slab at a stockpile on the construction site of the Isle of Grain Power

Background imageConstruction Collection: Fitters JLP01_08_096701

Fitters JLP01_08_096701
Grain Power Station, Grain, Isle of Grain, Medway, Kent. A group portrait of Laing fitters posed in front of a site bus at the Isle of Grain Power Station

Background imageConstruction Collection: Outfall team JLP01_08_096698

Outfall team JLP01_08_096698
Grain Power Station, Grain, Isle of Grain, Medway, Kent. group portrait of the outfall team at the Isle of Grain Power Station

Background imageConstruction Collection: Flume construction JLP01_08_096291

Flume construction JLP01_08_096291
Grain Power Station, Grain, Isle of Grain, Medway, Kent. A view towards the power house and main chimney during the construction of the Isle of Grain Power Station

Background imageConstruction Collection: Piling JLP01_08_089551

Piling JLP01_08_089551
Grain Power Station, Grain, Isle of Grain, Medway, Kent. Piling in progress during the construction of the Isle of Grain Power Station

Background imageConstruction Collection: Surveyor JLP01_08_089550

Surveyor JLP01_08_089550
Grain Power Station, Grain, Isle of Grain, Medway, Kent. A Laing surveyor using a theodolite on the construction site of the Isle of Grain Power Station

Background imageConstruction Collection: Concrete moulds JLP01_11_53758_10

Concrete moulds JLP01_11_53758_10
Glaxo Medical Research Centre, Gunnels Wood Road, Stevenage, Hertfordshire. A worker filling moulds with concrete during the construction of the Glaxo Research Centre in Stevenage

Background imageConstruction Collection: Safety training video JLP01_11_53757_01

Safety training video JLP01_11_53757_01
Glaxo Medical Research Centre, Gunnels Wood Road, Stevenage, Hertfordshire. Workers employed on the Glaxo Research Centre construction site in Stevenage watching a safety training video

Background imageConstruction Collection: Bricklaying JLP01_09_860042

Bricklaying JLP01_09_860042
Glaxo Pharmaceutical Works, Park Road, Ware, East Hertfordshire. A team of bricklayers building walls in a foundation trench during construction works at the Glaxo site in Ware

Background imageConstruction Collection: Tea break JLP01_09_852145

Tea break JLP01_09_852145
Glaxo Pharmaceutical Works, Park Road, Ware, East Hertfordshire. Two Laing workers taking a tea break amid the construction works at the Glaxo site in Ware



All Professionally Made to Order for Quick Shipping