mail_outline sales@mediastorehouse.com
Steel lining JLP01_11_52397_06SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL
Steel lining JLP01_11_47191_02SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL
Steel liner for the dome JLP01_10_49267SIZEWELL B POWER STATION, LEISTON, SUFFOLK COASTAL
Deck launch gantry JLP01_11_60005_08Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Deck launch gantry JLP01_11_58176_03Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Concrete caissons JLP01_11_56743_08Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Concrete batching plant JLP01_11_56741_06Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Transport Minister on TV JLP01_11_56739Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Concrete caissons JLP01_11_56739_03Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Deck launch gantry JLP01_10_57949Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Deck launch gantry JLP01_10_57844Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Piling rig JLP01_10_54657Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Piling rig JLP01_10_54654Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire
Surveying JLP01_10_54656Second Severn Crossing, M4 Motorway, New Passage, Pilning and Severn Beach, South Gloucestershire. A student engineer and a chain girl surveying
Reinforcing a floor slab JLP01_01_147_48SHELL HAVEN OIL REFINERY, SHELL HAVEN, STANFORD LE HOPE, ESSEX
Lifting an H-frame JLP01_01_147_49SHELL HAVEN OIL REFINERY, SHELL HAVEN, STANFORD LE HOPE, ESSEX
Preliminary mixer JLP01_01_029_47SHOREHAM CEMENT WORKS, UPPER BEEDING, HORSHAM, WEST SUSSEX. Looking down into Preliminary Mixer P4 at Shoreham Cement Works after completion of concrete work, showing three workers inside the mixer
Constructing preliminary mixers JLP01_01_028_084SHOREHAM CEMENT WORKS, UPPER BEEDING, HORSHAM, WEST SUSSEX. Workers constructing the preliminary mixers at Shoreham Cement Works
Preparing conical shutters JLP01_01_028_102SHOREHAM CEMENT WORKS, UPPER BEEDING, HORSHAM, WEST SUSSEX. A team of two preparing the internal cone shutters for the preliminary mixers at Shoreham Cement Works
Concreting JLP01_08_043851ROVER CAR COMPANY WORKS, LODE LANE, SOLIHULL, WEST MIDLANDS. Laing worker concreting work during the construction of the Rover factory in Solihull
St Ives 33203_010St Ives, Cornwall. Porthmeor Beach and the Tate St Ives art gallery, 2016
Asphalt surfacing JLP01_08_063000M6 Motorway, M6, Swynnerton, Stafford, Staffordshire
Surfacing the hard shoulder JLP01_01_172_095M6 Motorway, M6, Swynnerton, Stafford, Staffordshire. A view of the construction of the Birmingham to Preston Motorway (M6), showing a team of workers surfacing the hard shoulder at Hanchurch
M6 Motorway construction JLP01_01_164_26M6 Motorway, M6, Whitmore, Newcastle-under-Lyme, Staffordshire
Overbridge JLP01_08_062790M6 Motorway, M6, Stone, Stone Rural, Stafford, Staffordshire
M6 Motorway construction JLP01_08_059434M6 Motorway, M6, Doxey, Seighford, Stafford, Staffordshire
Keele Services JLP01_08_064262M6 Motorway, Keele Service Area, M6, Keele, Newcastle-under-Lyme, Staffordshire
Keele Services JLP01_08_066870M6 Motorway, Keele Service Area, M6, Keele, Newcastle-under-Lyme, Staffordshire
M6 construction Madeley Heath JLP01_01_165_12M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire. A view of the construction of the Birmingham to Preston Motorway (M6), looking north-west at Waltons Wood near Madeley Heath
Borrowbeck Viaduct JLP01_08_081834M6 Motorway, M6, Tebay, Eden, Cumbria
M6 Construction Lune Gorge JLP01_08_083561M6 Motorway, M6, Grayrigg, South Lakeland, Cumbria
M6 construction Madeley Heath JLP01_01_165_76M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire
M6 construction Madeley Heath JLP01_01_165_36M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire
M6 construction Madeley Heath JLP01_08_059936M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire
M6 construction Madeley Heath JLP01_08_059440M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire
M6 construction Madeley Heath JLP01_01_172_034M6 Motorway, M6, Madeley, Newcastle-under-Lyme, Staffordshire
Precast concrete JLP01_09_781447Peel Common Waste Water Treatment Works, Peel Common, Fareham, Hampshire. A view of large precast concrete units for the Browndown outfall of the Peel Common Sewage Works
Gangers JLP01_08_053945PORTISHEAD DOCK, PORTISHEAD AND NORTH WESTON, NORTH SOMERSET
Welder JLP01_08_053944PORTISHEAD DOCK, PORTISHEAD AND NORTH WESTON, NORTH SOMERSET. A portrait of a Laing welder working on the Portishead Dock project
Factory construction JLPP01_08_001296PATONS AND BALDWINS KNITTING FACTORY, LINGFIELD CLOSE, DARLINGTON. Laing workers fixing shuttering on the construction site of Patons and Baldwins knitting factory in Darlington
Sliding formwork JLP01_09_770526Newark Sugar Factory, Great North Road, Muskham, Newark, Newark and Sherwood, Nottinghamshire
Shuttering JLP01_08_000716PATCHWAY, SOUTH GLOUCESTERSHIRE. A man fixing the shuttering for the construction of Easiform housing in Bristol, possibly at the Patchway Estate
Earthmoving JLP01_08_063398Newcastle-under-Lyme, Staffordshire. Laing construction vehicles carrying out earthmoving on Section D of the Birmingham to Preston Motorway (M6)
Mixer lorry JLP01_01_165_45Newcastle-under-Lyme, Staffordshire
Barn Bank Lane bridge JLP01_08_059933M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
Barn Bank Lane bridge JLP01_08_059932M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
M6 Motorway construction JLP01_01_164_19M6 Motorway, M6, Audley Rural, Newcastle-under-Lyme, Staffordshire
Barn Bank Lane bridge JLP01_08_060500M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
Barn Bank Lane bridge JLP01_08_060498M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
Barn Bank Lane bridge JLP01_08_060469M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
Keele cutting JLP01_08_059934M6 Motorway, M6, Keele, Newcastle-under-Lyme, Staffordshire
Barn Bank Lane bridge JLP01_08_060467M6 Motorway, M6, Hyde Lea, Stafford, Staffordshire
Sloping structure JLP01_10_11822Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire. A close-up of the sloping precast concrete columns and structural glass at Napp Laboratories
Precast concrete structure JLP01_10_10244Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire
Structural glazing and ornamental lake JLP01_09_832102Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire. Two women standing beside the ornamental lake running along the southern elevation of Napp Laboratories
Structural glazing JLP01_09_823116Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire
Concrete staircase JLP01_09_822478Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire. A concrete staircase under construction in Napp Laboratories
Lab work JLP01_10_14269Napp Laboratories, Milton Road, Cambridge Science Park, Milton, South Cambridgeshire. A man working in the stability and analytical laboratory at Napp Laboratories
Footbridge construction JLP01_01_062_097NEWPORT PAGNELL M1 SERVICE AREA, NEWPORT PAGNELL, MILTON KEYNES
Footbridge construction JLP01_08_056940NEWPORT PAGNELL M1 SERVICE AREA, NEWPORT PAGNELL, MILTON KEYNES
Bridge deck JLP01_08_059521M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Road and rail JLP01_08_059517M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Surveying JLP01_08_059482M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Rail and road JLP01_08_059480M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Stafford Bypass JLP01_01_172_069M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Stafford Bypass JLP01_01_172_068M6 Motorway, M6, Acton Trussell and Bednall, South Staffordshire
Opening ceremony JLP01_08_67247AM6 Motorway, Knutsford Service Area, Knutsford, Tabley Superior, Cheshire East, Cheshire East. The Rt. Hon
Opening ceremony JLP01_08_67241M6 Motorway, Knutsford Service Area, Knutsford, Tabley Superior, Cheshire East, Cheshire East
Opening ceremony JLP01_08_67240M6 Motorway, Knutsford Service Area, Knutsford, Tabley Superior, Cheshire East, Cheshire East. William Kirby Laing with the Rt. Hon
Construction site JLP01_01_086_21PORTISHEAD B POWER STATION, PORTISHEAD AND NORTH WESTON, NORTH SOMERSET
Diver JLP01_08_010871aPLYMOUTH B POWER STATION, CITY OF PLYMOUTH
Climbing a piling frame JLP01_08_008728PLYMOUTH B POWER STATION, CITY OF PLYMOUTH. Workers climbing the ladder of a Menck piling frame during construction of a coaling wharf for Plymouth B Power Station
Laying foundations JLP01_08_000860PLYMOUTH B POWER STATION, CITY OF PLYMOUTH. A view of concrete being poured from a mixer into a wheelbarrow below, during work on the foundations for Plymouth B Power Station
Working at height JLP01_01_089_55PLYMOUTH B POWER STATION, CITY OF PLYMOUTH. A worker laying bricks to the top of the chimney shaft during the construction of Plymouth B Power Station
Launch site control JLP01_08_084525ANorth Cotes, East Lindsey, Lincolnshire. A view of the launch site of the Northcoates pipeline, showing a man in the foreground holding a two-way radio
Pipeline launch JLP01_08_084521North Cotes, East Lindsey, Lincolnshire. An aerial view of the launch site of the Northcoates pipeline, showing the pipeline, a cofferdam, floating sheerleg with accompanying tug and a header barge
Pipe lifting gear JLP01_08_084489North Cotes, East Lindsey, Lincolnshire. A view of the launch of the Northcoates pipeline, showing lifting equipment in the foreground
Installing sheet piling JLP01_08_083808North Cotes, East Lindsey, Lincolnshire. Two cranes installing sheet piles at mean tide level during civil engineering work on the Northcoates pipeline
Lifting gear and buoys JLP01_10_00562North Cotes, East Lindsey, Lincolnshire
Launching the pipeline JLP01_10_00557North Cotes, East Lindsey, Lincolnshire. A view from the shoreline showing the launch of the Northcoates pipeline, with lifting equipment at work including a floating sheerleg
Construction work JLP01_08_044355ICI RESEARCH ESTABLISHMENT, ALDERLEY PARK, NETHER ALDERLEY, CHESHIRE EAST
Oil refinery JLP01_10_08883Lindsey Oil Refinery, North Killingholme, North Lincolnshire. An exterior view of the newly completed Alkylation Unit at Lindsey Oil Refinery
Widening the M1 JLP01_10_10855HERTFORDSHIRE. Slipform paving machines laying a road surface during widening works on the M1, showing concrete being tipped into the machine in the foreground
Widening the M1 JLP01_10_10851HERTFORDSHIRE. Widening works on the M1 in Hertfordshire, showing slipform paving machines laying the surface of a new road alongside the existing carriageways