Skip to main content

Home > Images Dated > 2021 > November > 4 Nov 2021

Images Dated 4th November 2021

Choose a picture from our Images Dated 4th November 2021 Collection for your Wall Art and Photo Gifts

21 items

Background imageImages Dated 4th November 2021: Motorway base-laying JLP01_08_054742

Motorway base-laying JLP01_08_054742
DAVENTRY, NORTHAMPTONSHIRE. Construction machines laying a dry-lean concrete base in Section D4 of the London to Yorkshire Motorway (the M1)

Background imageImages Dated 4th November 2021: Eggborough Power Station JLP01_08_072337b

Eggborough Power Station JLP01_08_072337b
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. An exterior view of Eggborough Power Station, seen from the south-east

Background imageImages Dated 4th November 2021: Occupational healthcare JLP01_08_053294

Occupational healthcare JLP01_08_053294
A view of a site nurse employed on Project B of the London to Yorkshire Motorway (the M1), examining the eyes of a Laing worker

Background imageImages Dated 4th November 2021: In the bar JLP01_08_067943

In the bar JLP01_08_067943
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. A group of workers socialising at the bar of the snug at the Eggborough Power Station Social Club

Background imageImages Dated 4th November 2021: Pipeline JLP01_10_02619

Pipeline JLP01_10_02619
CUMBRIA. A view along the route of the Brampton pipeline, showing the pipe at a 45 degree angle in the foreground, where it meets a slope

Background imageImages Dated 4th November 2021: Pipeline JLP01_10_02606

Pipeline JLP01_10_02606
CUMBRIA. A view along the route of the Brampton pipeline, showing pipelaying equipment in the foreground lowering the pipeline into a trench

Background imageImages Dated 4th November 2021: Helicopter flight JLP01_08_053536

Helicopter flight JLP01_08_053536
Artist Terence Cuneo in a BEA helicopter, ready for a flight over the London to Yorkshire Motorway in preparation for a painting

Background imageImages Dated 4th November 2021: Catering JLP01_08_053300

Catering JLP01_08_053300
A member of catering staff preparing food for staff working on the construction site of the London to Yorkshire Motorway (the M1)

Background imageImages Dated 4th November 2021: Catering van JLP01_08_053297a

Catering van JLP01_08_053297a
Laing workers employed on the construction site of the M1, the London to Yorkshire Motorway, queuing for the catering van on their tea break. These workers were employed on Section C of the project

Background imageImages Dated 4th November 2021: Catering van JLP01_08_053297

Catering van JLP01_08_053297
Laing workers employed on the construction site of the M1, the London to Yorkshire Motorway, queuing for the catering van on their tea break. These workers were employed on Section C of the project

Background imageImages Dated 4th November 2021: Trucks JLP01_08_052192

Trucks JLP01_08_052192
A Shell-BP fuel tanker and a Laing truck at a concrete batching plant on the construction site of the London to Yorkshire Motorway (the M1)

Background imageImages Dated 4th November 2021: Aerial inspection JLP01_08_051585

Aerial inspection JLP01_08_051585
A helicopter taking off from Project C Office to inspect progress in the construction of the M1, the London to Yorkshire Motorway. The helicopter flight was to inspect progress on the motorway

Background imageImages Dated 4th November 2021: Motorway base course construction JLP01_142_53

Motorway base course construction JLP01_142_53
A Blaw-Knox PF90 Spreader laying a base course of dry-lean concrete on Project A of the London to Yorkshire Motorway (the M1)

Background imageImages Dated 4th November 2021: Pipeline JLP01_10_03787

Pipeline JLP01_10_03787
CUMBRIA. A helicopter flying over a row of Caterpillar pipelayers during the installation of the Brampton pipeline. In 1975

Background imageImages Dated 4th November 2021: Pipeline JLP01_10_02617

Pipeline JLP01_10_02617
CUMBRIA. Welders at work on the Brampton pipeline. In 1975, Laing Pipelines laid the Brampton gas pipeline between Longtown near Carlisle to the east of Bishop Auckland

Background imageImages Dated 4th November 2021: Pipeline JLP01_09_752704

Pipeline JLP01_09_752704
CUMBRIA. A view of pipelaying equipment lowering the Brampton pipeline into a trench. In 1975, Laing Pipelines laid the Brampton gas pipeline between Longtown near Carlisle to the east of Bishop

Background imageImages Dated 4th November 2021: Eggborough Power Station JLP01_08_075183a

Eggborough Power Station JLP01_08_075183a
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. A view of Eggborough Power Station from the south-west, showing a front-loader tractor working in the field in the foreground

Background imageImages Dated 4th November 2021: Eggborough Power Station JLP01_08_075180

Eggborough Power Station JLP01_08_075180
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. A view of Eggborough Power Station framed by trees, seen from the south-west

Background imageImages Dated 4th November 2021: Eggborough Power Station JLP01_08_072336

Eggborough Power Station JLP01_08_072336
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. An exterior view of Eggborough Power Station, seen from the south-west

Background imageImages Dated 4th November 2021: Installing a cooling water pipe JLP01_08_066296

Installing a cooling water pipe JLP01_08_066296
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. Looking through a section of pipe on the construction site of Eggborough Power Station

Background imageImages Dated 4th November 2021: Plans and diagrams JLP01_08_065035a

Plans and diagrams JLP01_08_065035a
EGGBOROUGH POWER STATION, A19, EGGBOROUGH, SELBY, NORTH YORKSHIRE. Four Laing workers looking at plans for the stressing of cooling water pipes during the construction of Eggborough Power Station


All Professionally Made to Order for Quick Shipping