34 Framed Prints
Shaft for column foundations JLP01_08_083513HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. A man looking upwards in a 75ft shaft lined with reinforcement steel
Hangar walls JLP01_08_086298HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. The BEA aircraft servicing hangar at Heathrow Airport during construction
Concrete batching plant JLP01_01_006_09FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. A concrete batching plant, with a Laing truck being loaded in the foreground, at Filton Airfield during the construction of a new runway
Runway construction JLP01_01_007_01FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. An aerial view from the west showing the construction of a new runway at Filton Airfield
Birmingham Eurohub interior JLP01_10_50359Birmingham International Airport, Elmdon, Birmingham, Bickenhill, Solihull, West Midlands. The information desk in the Eurohub terminal at Birmingham International Airport soon after its completion
Final piece JLP01_11_30115_07STANSTED AIRPORT, STANSTED, STANSTED MOUNTFITCHET, UTTLESFORD, ESSEX. A crane lifting the final roof dome of the terminal building at Stansted Airport in to position as part of the topping out
Stansted shuttle JLP01_10_47894STANSTED AIRPORT, STANSTED, STANSTED MOUNTFITCHET, UTTLESFORD, ESSEX. The platform between the rails of the passenger transport shuttle at the new terminal building at Stansted Airport illuminated at
Runway construction JLP01_08_008192RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A man standing on a roller during the laying of asphalt on a new runway under construction at Gaydon Airfield
Runway construction JLP01_08_008198RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A man working during the construction of Gaydon Airfield, using a lever tool to remove a rivet fastening from shuttering formwork running along
Concrete foundations JLP01_08_008177RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. Men carrying out construction work at Gaydon Airfield, pouring and levelling concrete during the concreting of a buildings footprint
Runway construction JLP01_08_007948RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. Work underway on the construction of a new runway at Gaydon Airfield
Compacting the runway JLP01_08_022162aRAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A workman operating a Holman compactor during concreting of a runway or aircraft apron at Gaydon Airfield
Roofing JLP01_08_008427RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A man fitting corrugated roofing panels onto the roof of a newly constructed building at Gaydon Airfield
Carpentry JLP01_08_008287RAF Gaydon, Gaydon, Stratford-on-Avon, Warwickshire. A workman using an electric circular saw to cut wood for use in the construction of buildings at Gaydon Airfield
Heathrow Express JLP01_11_63143_04HEATHROW AIRPORT, HILLINGDON, HILLINGDON, GREATER LONDON. Passengers boarding a train at platform 1 of the Heathrow Express rail link
Heathrow Express JLP01_11_63143_02HEATHROW AIRPORT, HILLINGDON, HILLINGDON, GREATER LONDON. Passengers alighting from a train at platform 1 of the Heathrow Express rail link
Hangar walls JLP01_08_086451HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. The west wall of the BEA aircraft servicing hangar at Heathrow Airport during its construction
Hangar roof framework JLP01_08_085366HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. Looking over the steel roof of the BEA aircraft servicing hangar at Heathrow Airport during its construction
Hangar support column JLP01_08_084165HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. A steel octagonal column being lowered by a crane into a shaft
Site canteen JLP01_08_083797aHEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. Laing workmen playing a card game at a table in the site canteen during the construction of the BEA aircraft servicing
Site canteen JLP01_08_083796HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. Three Laing workmen sitting at a table after a meal in the site canteen during the construction of the BEA aircraft
Lattice framework JLP01_08_083781HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. The metal lattice framework core of the roof structure of the BEA aircraft servicing hangar at Heathrow Airport
Site canteen JLP01_08_083794HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. Laing workmen talking at a table in the site canteen during the construction of the BEA aircraft servicing hangar at
Shaft for column foundations JLP01_08_083512HEATHROW AIRPORT, B E A SERVICING HANGAR, HEATHROW, HILLINGDON, GREATER LONDON. Concrete being poured into a shaft for the foundations of the BEA aircraft servicing hangar at Heathrow Airport
Bristol Brabazon JLP01_08_070272FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. The Bristol Brabazon G-AGPW on the runway at Filton Airfield. The first prototype of the Bristol Brabazon, designed by the Bristol Aeroplane Company
Derrick cranes JLP01_01_007_21FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. An aerial view showing derrick cranes and a concrete batching plant amid heaps of aggregate at Filton Airfield, during the construction of a new runway
Runway construction JLP01_01_007_05FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. An aerial view showing trucks and workmen on the runway at Filton Airfield during concreting
Sheepsfoot roller JLP01_01_006_42FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. A sheepsfoot roller carrying out compaction work during the construction of the runway at Filton
Loading a lorry JLP01_01_005_35FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. A dragline excavator depositing material from a bucket into a flatbed van during the construction of a new runway at Filton Airfield
Refuelling JLP01_01_004_73FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. A Laing face shovel excavator refuelling from a 750 gallon tanker at Filton Airfield during the construction of a new runway
Lorries JLP01_01_005_19FILTON AIRFIELD, SOUTH GLOUCESTERSHIRE. Rapid Concrete Breaking Co Ltd trucks at Filton Airfield during construction of a runway, with construction work in progress beyond
Birmingham Maglev JLP01_09_832036Birmingham International Airport, Elmdon, Birmingham, Bickenhill, Solihull, West Midlands. Workmen inspecting a new Maglev car on the new Maglev system at Birmingham Airport near the end of its
Terminal interior JLP01_09_850079Birmingham International Airport, Elmdon, Birmingham, Bickenhill, Solihull, West Midlands. The interior of the central well in the new terminal building at Birmingham International Airport after its
Brabazon Hangar DP137889Brabazon Hangar, Filton Airport, Bristol, Somerset. General view of hangar. Post War Buildings